Skip to content

INDUSTRIAL

Liquid Telecoms

Date: Jun 2018 – Apr 2021

Location: Midrand, RSA

Product: Grid-tied

Service: EPC

A 824 kWp multi-phased rooftop and solar carport installation for one of the largest data centres in South Africa. The project consisted of various roofs as well as two different types of carport structures to accommodate the site specific requirements.

This project forms part of the larger Liquid Telecoms solar plant roll-out which also includes a 1.1 MWp rooftop solar PV plant in Nairobi, Kenya which was also constructed by SPS.

INDUSTRIAL

Liquid Telecoms

Date: Jun 2018 – Apr 2021

Location: Midrand, RSA

Product: Grid-tied

Service: EPC

A 824 kWp multi-phased rooftop and solar carport installation for one of the largest data centres in South Africa. The project consisted of various roofs as well as two different types of carport structures to accommodate the site specific requirements.

This project forms part of the larger Liquid Telecoms solar plant roll-out which also includes a 1.1 MWp rooftop solar PV plant in Nairobi, Kenya which was also constructed by SPS.

INDUSTRIAL

Liquid Telecoms

Date: Jun 2018 – Apr 2021

Location: Midrand, RSA

Product: Grid-tied

Service: EPC

A 824 kWp multi-phased rooftop and solar carport installation for one of the largest data centres in South Africa. The project consisted of various roofs as well as two different types of carport structures to accommodate the site specific requirements.

This project forms part of the larger Liquid Telecoms solar plant roll-out which also includes a 1.1 MWp rooftop solar PV plant in Nairobi, Kenya which was also constructed by SPS.